Six Mile Creek Bridges

 

HIG was commissioned to provide a Project Development Report and Preliminary Bridge Design for a new creek crossing on Redbank Plans Road in Ipswich City. The existing crossing was regularly inundated with flood waters and the existing culvert had reached the end of its design life. Due to the close proximity of residential areas, afflux issues also need to be carefully considered. Our engagement included design development and costing of the new, upgraded crossing.

Six Mile Creek Bridges

« Back

Our Credentials